Before
Concrete was in desperate need of repair.
Steps and porch cap being removed.
New wing walls for the steps.
Porch cap is formed.
Inside of porch gets fresh layer of peastone. Rebar is placed and will be puled up into the concrete as it poured.
Concrete is down and we can move on to the columns and pillars.
Colums and pillars are complete. Area gets new topsoil to repair grade.
Railing is installed.
All cleaned up and ready for traffic.